{"id":20,"date":"2015-03-17T12:26:14","date_gmt":"2015-03-17T11:26:14","guid":{"rendered":"http:\/\/192.168.38.35:82\/wp-dannenberg_2015a\/?page_id=20"},"modified":"2018-04-16T17:49:46","modified_gmt":"2018-04-16T15:49:46","slug":"referenzen","status":"publish","type":"page","link":"https:\/\/www.ing-dannenberg.ch\/en\/referenzen\/","title":{"rendered":"Projectlist"},"content":{"rendered":"<a href=\"http:\/\/www.ing-dannenberg.ch\/wp-content\/uploads\/diverses\/projektliste_ag_en.pdf\" class=\"su-button su-button-style-glass\" style=\"color:#FFFFFF;background-color:#0d324c;border-color:#0b283d;border-radius:5px\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"color:#FFFFFF;padding:0px 16px;font-size:13px;line-height:26px;border-color:#567082;border-radius:5px;text-shadow:none\"> as PDF-Document&#8230;<\/span><\/a>\n<hr \/>\n<div class=\"su-accordion su-u-trim\">\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Norbord Europe Ltd. - New OSB Production Line - Inverness<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>The plant in Inverness was expanded by a production line for OSB boards.<br \/>\nWe were commissioned to take over the coordination and compilation of plant and buildings. We were responsible for all plant frameworks and foundations on site. We especially did all the structural engineering for the area Holtec (wood area).<\/p>\n<p>Our services included:<br \/>\n&#8211; coordination<br \/>\n&#8211; 3D modelling and collision check.<br \/>\n&#8211; Checking and approval of the plant installation<br \/>\n&#8211; Checking and coordinating of building services<br \/>\n&#8211; structural engineering<br \/>\n&#8211; infrastructure, cables, thermal oil, transportation routes<br \/>\n&#8211; steel structure workshop drawings<br \/>\n&#8211; reinforcementdrawings for concrete parts<br \/>\n&#8211; outdoor facility planning of roads and drainage<\/p>\n<p><strong><em>Completion: 2017<\/em><\/strong><br \/>\n<strong> <em>Investment costs: 130 Mio. \u20ac<\/em><\/strong><br \/>\n<em><strong>Contact: Mr. McMeekin<\/strong><br \/>\n<\/em><\/p>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Interspan - Production plant for OSB- and particle boards<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>A new production plant for OSB- and particle boards is to be erected on a previous production sit of the Swiss Krono group.<\/p>\n<p>General planning: design, cost budgeting, co-ordination of machine and equipment layout, building and structural design, integration in the existing infrastructure, budget analysis for approval for the investors<\/p>\n<p><strong><em>Completion: 2014<\/em><\/strong><br \/>\n<strong><em>Investment costs: 100 m \u20ac<\/em><\/strong><br \/>\n<strong><em>Contact: Mr. Dr. Matthias Iredi<\/em><\/strong><\/p>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Krono Star - Addition of a continuous particle board line in an existing production plant<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>General planning:\u00a0cost budgeting, machine and equipment layout, pre design, site feasibility, co-ordination with the local building authorities<\/p>\n<p><strong><em>Completion: pending<\/em><\/strong><br \/>\n<strong><em>Investment<\/em><\/strong><strong><em> costs:\u00a050 m \u20ac<\/em><\/strong><br \/>\n<strong><em>Contact: Mr. Dr. Matthias Iredi<\/em><\/strong><\/p>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Kronotec AG - Erection of an OSB-Plant<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>Production for OSB-Boards.<\/p>\n<p>General planning: finding the suitable property, design of all buildings, co-ordination of the specialty planning for fire prevention and geology, preperation of all documents in russian; filing for building permit at the Russian authorities, static calculations according to SNiP-standard, design of infrastructure and draining systems, steelmanufacturing drawings, cost budgeting<\/p>\n<p><strong><em>Completion: pending<\/em><\/strong><br \/>\n<strong><em>Investment costs: 200\u00a0m \u20ac<\/em><\/strong><br \/>\n<strong><em>Contact: Mr. Dr. Matthias Iredi<\/em><\/strong><\/p>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Kronopol Sp.z.o.o. - Extension of the lumber storage area<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>The extension of the lumber storage area for the wood poduction plant Zary for Kronopol Sp.z.o.o by the area of 30,000m\u00b2. Further, a second entry gate had to be concidered for the next building phase.<\/p>\n<p>General planning: design, cost budgeting, execution planning, tender process, consultation for contracting, construction supervision, inspection and approval<\/p>\n<p><em><strong>Completion: November 2014<\/strong><\/em><br \/>\n<strong><em>Construction<\/em><\/strong><em><strong> costs: 3.2\u00a0m \u20ac<\/strong><\/em><br \/>\n<em><strong>Contact: Mr. Prof. Dr. Joachim Hasch<\/strong><\/em><\/p>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Krono Ukraine - Erection of a new sanding line<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>Erection of a new sanding line with automated unfinished board storgage for the particleboard production in Broshiniv Osada, Ukraine.<\/p>\n<p>General planning: design, cost budgeting, static calculations, reinforcement- and formwork drawings, steel modeling, steel manufacturing drawings, performance specifications, preparations for awarding contracts<\/p>\n<p><em><strong>Completion: 2013<\/strong><\/em><br \/>\n<strong><em>Construction<\/em><\/strong><em><strong> costs: 0.8\u00a0m \u20ac<\/strong><\/em><br \/>\n<em><strong>Contact: Mr. Dr. Matthias Iredi<\/strong><\/em><\/p>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Swedspan Slovakia s.r.o. - Ercection of a production plant for particle- and OSB boards<\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>Erection of a production plant for particle- and OSB boards in Malacky, Slowakia. Our scope of work included the production facilities with their buildings from the screening to the shipping department.<\/p>\n<p>General planning: pre planning, design, cost budgeting, static calculations, reinforcement- and formwork drawings, steel modeling, steel manufacturing drawings, performance specifications, participating for awarding contracts, supporting construction supervision, quality inspection and approval<\/p>\n<p><em><strong>Completion: 2013<\/strong><\/em><br \/>\n<strong><em>Investment<\/em><\/strong><em><strong> costs: 140 m \u20ac<\/strong><\/em><br \/>\n<em><strong>Contact: Mr. Luc Serdons<\/strong><\/em><\/p>\n<\/div><\/div>\n<div class=\"su-spoiler su-spoiler-style-fancy su-spoiler-icon-plus su-spoiler-closed\" data-scroll-offset=\"0\" data-anchor-in-url=\"no\"><div class=\"su-spoiler-title\" tabindex=\"0\" role=\"button\"><span class=\"su-spoiler-icon\"><\/span>Kronotec AG - Modernization of a particleboard production plant <\/div><div class=\"su-spoiler-content su-u-clearfix su-u-trim\">\n<p>A new production line for particleboards\u00a0was built for the Kronotec AG\u00a0production plant in Charkow, Ukraine.<\/p>\n<p>General planning:\u00a0design,\u00a0cost budgeting, static calculations, reinforcement- and formwork drawings, steel manufacturing drawings according to Ukrainian standards, performance specifications, preparations for awarding contracts<\/p>\n<p><em><strong>Completion: planning completed<\/strong><\/em><br \/>\n<em><strong>Investment costs: 35 m\u00a0\u20ac<\/strong><\/em><br \/>\n<em><strong>Contact: Mr.\u00a0Dr. Matthias Iredi<\/strong><\/em><\/p>\n<\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-20","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ing-dannenberg.ch\/en\/wp-json\/wp\/v2\/pages\/20","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ing-dannenberg.ch\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ing-dannenberg.ch\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.ch\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ing-dannenberg.ch\/en\/wp-json\/wp\/v2\/comments?post=20"}],"version-history":[{"count":110,"href":"https:\/\/www.ing-dannenberg.ch\/en\/wp-json\/wp\/v2\/pages\/20\/revisions"}],"predecessor-version":[{"id":2624,"href":"https:\/\/www.ing-dannenberg.ch\/en\/wp-json\/wp\/v2\/pages\/20\/revisions\/2624"}],"wp:attachment":[{"href":"https:\/\/www.ing-dannenberg.ch\/en\/wp-json\/wp\/v2\/media?parent=20"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}